Preparing an incurred cost proposal (ICP) is one of the most time-consuming compliance tasks for government contractors. The ICP Dashboard automates the entire process — from data entry through final Excel export — so you can submit a complete, audit-ready proposal in minutes instead of weeks.
Automated ICP Schedule Generation (A–O)
The ICP Dashboard generates all 20+ schedules required by FAR 52.216-7, including Schedule A (Rate Summary), Schedule B (G&A Pool), Schedule C (Overhead Pools), Schedule H (Direct Costs by Contract), and Schedule I (Cumulative Costs & Billings). Each schedule is computed using an 18-step pipeline that ensures cross-schedule reconciliation and mathematical accuracy to 4 decimal places for indirect rates.
Built-in DCAA Adequacy Review
Before submitting your ICP, run the full 47-question DCAA Adequacy Checklist (v3.4) directly in the dashboard. The tool auto-populates answers from your generated data, tracks completion progress, and flags risk areas — giving you confidence that your submission will pass the initial DCAA adequacy screening without rejection.
FAR 31.205 Unallowable Cost Validation
The validation engine scans your general ledger data against 21 FAR 31.205 cost principles to identify potentially unallowable costs before they reach the auditor. Categories include entertainment, lobbying, interest, and other costs that FAR explicitly disallows on government contracts.
CAS 410 Scenario Modeling
Compare up to three G&A allocation base scenarios — Total Cost Input (TCI), Value Added, and Single Element — to see how each CAS 410 base selection impacts your indirect rates. This what-if analysis helps you choose the allocation method that best reflects your cost structure and maximizes compliance.
The interactive overview below walks through each feature in detail. Explore the dashboard's full capabilities and see how it simplifies incurred cost proposal preparation for government contractors of any size.